


Amazon US station heating/heating vest UL499 certification is indispensable for the sale of electronic products on Amazon. Safety test report is indispensable, especially after the product is put on the shelves, the safety product must be submitted within 7 working days as required by Amazon, otherwise the product will be restricted from the shelf .
Like heating vests sold on Amazon, you need to provide UL499 safety test report Wen Gong 18102797454
UL499 test content:
1. Leakage current test
2. Input test
3. Leakage current test under tidal state
4. Normal temperature rise test
Five, high pressure test
6. Stability test
Seven, abnormal test (DRY)
Eight, abnormal test (BYPASSED REGULATING DEVICE)
9. Static pressure and strength test
10. Blown fuse test
11. Power cord pull test
12. Power line thrust test
13. Plastic deformation test
14. Impact test
15. Overflow test
16. Grounding resistance test
Seventeen, waterproof gasket aging test
Consult Wen Gong 18102797454
Information to be submitted:
Amazon may ask you to provide the following information at any time, so we recommend that you keep this information easily accessible:
● your company name (if applicable) and seller number;
● your contact information: email address and telephone number;
● a list of all hair dryers you have published;
● Product images of all hair dryers you have posted. Images must contain all of the following relevant information:
°Safety Information
°Compliance Mark
°Commodity hazard warning
● All product descriptions and/or manuals for all hair dryers you publish
●A test report issued by an ILAC ISO 17025 accredited laboratory confirming that each item has been tested and complies with the above applicable
Fever vest UL499 test report application process:
1. Send the test prototype to the test laboratory
2. Fill out the test application form
3. Provide detailed product specifications
4. Confirmation of the draft report of the certificate issued after passing the test
5. Confirm that it is correct and issue a formal UL499 test report
Fever vest UL499 test report The test cycle can be 5 working days
