• Home
  • Services
  • Payment
  • FAQ
  • About
  • Contact
  • News
In-depth review!Recent Amazon-related news that Amazon sellers should know
In-depth review!Recent Amazon-related news that Amazon sellers should know
10/10/2022
What is CPC Certification?Amazon US station CPC certification requirements
What is CPC Certification?Amazon US station CPC certification requirements
10/10/2022

Amazon Electronics Hand Warmer, Heated Socks, Heater Safety Audit UL499 Test

10/10/2022
Categories
  • News
Tags
  • certification
  • import and export
Amazon Electronics Hand Warmer, Heated Socks, Heater Safety Audit UL499 Test

Recently, many customers have come to consult, someone on Amazon complained that the product caught fire, and Amazon asked for a UL report. What should I do? Especially for battery products, many sellers have asked the same question.Don't worry, our company has dealt with many similar products and provided corresponding reports for many merchants, allowing them to successfully deal with this crisis

UL499 test content

1. Leakage current test

2. Input test

3. Leakage current test under tidal state

4. Normal temperature rise test

Five, high pressure test

6. Stability test

Seven, abnormal test (DRY)

Eight, abnormal test (BYPASSED REGULATING DEVICE)

9. Static pressure and strength test

10. Blown fuse test

11. Power cord pull test

12. Power line thrust test

13. Plastic deformation test

14. Impact test

15. Overflow test

16. Grounding resistance test

Seventeen, waterproof gasket

Aging test

1. Leakage current test

(1) Methods and conditions: place the prototype on an insulating plane to test the leakage current between bare non-charged metal parts or between a plastic casing (with the help of 1*20cm tin foil) and an uncharged conductor, and the following conditions are required to be tested The leakage current of:

a) Before power on

b) Electric heating until thermal equilibrium

c) After a power outage

(2) Requirements: leakage current ≤ 0.5mA. –I8I. 22O. . 403.11

2. Input test

(1) Methods and conditions: The prototype is connected to an adjustable voltage of 120v, 60Hz, fully heated, and the power under 120v is monitored and the voltage required to reach the rated power.

(2) Requirements: 90% of nominal power ≤ test power ≤ 105% of nominal power.

3. Leakage current test under tidal state

(1) Methods and conditions: The test sample is placed in a tidal state with a relative humidity of 88 ± 2% and 32 ± 2 °C for 48 hours, and the following leakage current tests are carried out until the leakage current is stable:

a) Before heating

b) 05s after heating, 5s5min, 5min thermal equilibrium

c) After power off (2) Requirements: leakage current ≤ 0.5mA

Share
0

Related posts

The difference between Amazon FBA and FBM, where are the advantages of the two
02/11/2023

The difference between Amazon FBA and FBM, where are the advantages of the two


Read more
How to quickly activate sales after Amazon products are out of stock
02/11/2023

How to quickly activate sales after Amazon products are out of stock


Read more
02/10/2023

What is Amazon Price Protection? how to apply?


Read more

Find us here


Contact with us


Arthink Network Technology Co., Ltd.

support@amzwizard.net

chenchen2679@gmail.com

Localization


Shenzhen, Guangdong
China

Terms and others


Privacy

Terms of Use

© 2015-2023 AmzWizard. All Rights Reserved.
    Wechat

    ID: fhstudio01

    QRCode:

    Amazon seller service,Amazon fba service,Amazon review service,Amazon appeal service,remove negative review